Chemical cleaning is the process of dissolving or removing hard deposits from piping surfaces or process equipment using chemicals, particularly steam lines entering turbines and steam drums. Following cleaning, these pipelines must be clear of pollutants such as rust, scale, hydrocarbons, greases, and oils. The use of effective cleaning supplies Melbourne is necessary to meet these objectives.
For what reason is chemical cleaning required?
During construction, the carbon steel pipelines used in most steam systems will be filled with slags, welding spatters, and rust. The time needed to flush the steam lines will be a third of what it would be without the chemical cleaning. This will increase pipeline quality and shorten the project timeline.
Things you need to know about Chemical Cleaning
There are many things to know before you implement it or if you are thinking about implementing cleaning chemicals in your house. Some of the conditions that must be fulfilled before the implementation of chemical cleaning are as follows:
-
Isolation of cleaning system
Closing valves will isolate the cleaning system from the other pipes. Also, steel wire must lock certain valves and prominently mark them as "DON'T OPEN."
-
Instruments
The instruments and their leads must be removed and separated from the systems that need to be cleaned. If the instrument's leading cannot be removed, the drain valve on the instrument leading must be opened, and the instrument's inlet valve must be precisely closed.
Chemical Cleaning Preparation Work
Before beginning any chemical cleaning operations, the following tasks must be finished:
- Installation and setup of temporary equipment, such as a steam mixing heater, circulation pump, chemical injection pump, chemical dissolving tank, ejector, waste neutralization tank, waste water pump, and hydrazine injection system.
- Temporary equipment for circulation and by-pass, and temporary piping between the temporary equipment and the permanent facility's tie-in point.
- Using a rubber hose, install the solution recovery line onto the drain and vent. Blind plates must be installed at non-essential components and safety valves. The system's restricting orifice is installed. Ensure that you opt for the right cleaning supply store to avail of the best products without which the preparation will be ineffective.
- The system's lines and valves, including the temporary pipe, must be cleaned. Utility pipes connect the cleaning system to the supply point.
The chemical cleaning procedure
There are different steps that need to be followed so that the cleaning chemicals work effectively to their full potential. All the steps are described below:
- Until the drainage is visually clean, a temporary circulation pump must be used to flush the water. Following water flushing, water circulation must be established in the cleaning loop and pressured to the circulation pump's maximum pressure. If any leaks exist, they must be fixed.
- Steam will be added to the cleaning system from the existing steam line to create water circulation. The heating process must continue until the temperature reaches 70°C.
- During the heating-up process, the contractor must supply the necessary amount of chemicals in the Chemical Injection Tank. Once the system has finished heating up, the chemical solution will be supplied to be cleaned by running the Chemical Injection Pump. We refer to this as degreasing. To determine the cleaning solution's quality, alkalinity must be checked hourly.
- The cleaning system will be supplied with water until it reaches total capacity. Down Flow is required to do the initial flushing before filling. Rinsing must be done until the pH of the flowing water is less than 10.
- Cleaning with acid should be done. The contractor is responsible for supplying all the chemicals in the Chemical Injection Tank throughout the heating process following rinsing. The chemical solution must be fed into the system to be cleaned by running the Chemical Injection Pump once it has finished heating up.
- Steaming into the cleaning loop must be stopped, and the system must be continuously circulated and allowed to cool to 60°C through natural radiation. With a slow ammonia injection, the circulating solution will be ammoniated to a pH of 8.5 to 9.0. The pH must be determined at each stage of the cleaning cycle.
- Finally, under positive nitrogen pressure, the cleaning solution must be drained from every low point.